Location: Carephone Warehouse HQ, Acton, London

Architectural Decoration for Christmas Ad Campaign

  
 

180m of red PVC fabric were used to gift wrap the building along with a finishing bow as part of the ad campaign. From the initial phone call to completion was 11 days, with the crew on site for two days. This project was in conjunction with a flood lighting scheme supplied by Prism.